Negotiable
The date of payment from buyers deliver within days
Fujian
Long-term effective
2017-12-23 19:57
303
Company Profile
Xiamen Prodrill Equipment Co., Ltd.By certification [File Integrity]
Contact:Mr. Simon(Mr.)
Email:
Telephone:
Area:Fujian
Address:Fujian
Website: http://prodrill.jssytm.com/
Power model | Oil pumping station reserves | Engine Power | Voltage | Working pressure | Flux | Towable of splitter quantity |
(L) | (KW) | (V) | (MPA) | (L/M) | (PC) | |
Electric motor | 30 | 0.75 | 220 | 60 | 4 | 1 |
1.5 | 380 | 4 | 1 | |||
4 | 380 | 14 | '1-6 | |||
7.5 | 380 | 14 | '1-10 | |||
Diesel motor | 50 | 5.1 | 60 | 14 | '1-6 |
Model | Pre-drilling Hole Diameter | Counter Wedge Diameter | Counter Wedge Length | Drilling Depth | Steel Cylinder With wedges |
Aluminium Cylinder With wedges |
Wedges |
(mm) | (mm) | (mm) | (mm) | (NW: kgs/set) | (NW: kgs/set) | (NW: kgs/set) | |
PD40-250 | 42 | 40 | 250 | 550 | 34 | 27 | 9 |
PD42-350 | 44 | 42 | 350 | 650 | 35 | 28 | 10 |
PD44-450 | 46 | 44 | 450 | 750 | 36 | 29 | 11 |
All kinds of natural stones, rock, granite, marble mining & quarrying
Machine bases fracture
Bridge columns demolition
Reinforced concrete structures removal
Mass foundations splitting
Controlled demolition of pillars, concrete and walls where heavy equipment is impractical
Staircase removal
Premises that may be in continual use such as hospitals, factories, offices and hotels
removing redundant reinforced concrete structures, concrete machine beds and plinths, mass filled concrete etc.
Underwater demolition
Demolition in a restricted space
Tunnel work
Trench excavation